Planning for What Could Go Wrong, When in Fact It Could Go Right—The Importance of Risk Management on Tunneling and Underground Construction Projects

机译:计划什么可能出错,实际上什么时候可能正确—隧道和地下建设项目中风险管理的重要性

获取原文
获取原文并翻译 | 示例

摘要

Regardless of whether a tunneling program or project is in the planning, design, or executionrnphase tackling risks early on is more time and cost-effective than responding to problems. From inception,rnprojects carry more risk than anticipated resulting in missing target dates and experiencing cost increases.rnAs projects unfold, new risks arise, and they become problems if not identified and acted on immediately. Thisrnpaper outlines key risk management strategies for owners, tunnel designers and constructors that eliminate, orrnlessen the severity of, as much risk as possible from the earliest project planning and design stages.
机译:无论隧道计划或项目是否处于计划,设计或执行阶段,尽早解决风险都比对问题进行响应更省时,更具成本效益。从一开始,项目所承担的风险就比预期的要多,从而导致目标日期缺失和成本增加。随着项目的开展,新的风险就会产生,如果不立即采取行动,它们就会成为问题。本白皮书概述了针对业主,隧道设计人员和施工人员的关键风险管理策略,这些策略可以从项目的最早规划和设计阶段就消除,降低风险的严重性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号