首页> 外文会议>North American tunneling 2014 proceedings >Structural Repair of Cross-Passage 5, Interstate 70 Hanging Lakes Tunnel
【24h】

Structural Repair of Cross-Passage 5, Interstate 70 Hanging Lakes Tunnel

机译:悬湖70号州际公路跨通道5的结构修复

获取原文
获取原文并翻译 | 示例

摘要

The twin bore Hanging Lake Tunnels (HLT) in Colorado on Interstate 70 (I‑70) are operated byrnthe Colorado Department of Transportation (CDOT). The tunnels include eight (8) cross-passages that housernsensitive equipment and provide emergency egress. Structural integrity inspections were conducted in 2009.rnCracked shotcrete was observed in Cross-Passage 5 (CP‑5).rnAreas in CP‑5 had substantial de-lamination of the shotcrete. A ground characterization plan was accomplishedrnbased on exploratory drilling and testing. An innovative repair was developed including Polyurethanern(PUR) injection, and installation of tensioned rock bolts. The repair was successfully completed in late 2010rnand monitoring of the cross-passage is ongoing.
机译:科罗拉多州70号州际公路(I‑70)上的双孔悬挂湖隧道(HLT)由科罗拉多州交通运输部(CDOT)运营。隧道包括八(8)个交叉通道,可容纳敏感设备并提供紧急出口。 2009年进行了结构完整性检查。rn在交叉通道5(CP-5)中观察到破裂的喷射混凝土。rn CP-5的区域对喷射混凝土产生了严重的分层。在探查和测试的基础上完成了地面表征计划。开发了一种创新的修复方法,包括注入聚氨酯(PUR)和安装张紧的岩石螺栓。维修工作已于2010年底成功完成,并且正在对交叉通道进行监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号