The New Irvington Tunnel, located in Alameda County, California, is a key component of SanrnFrancisco’s Water System Improvement Program. Mining of the 3.5-mile tunnel started in March 2011 and wasrncompleted in October 2013. Installation of the final lining is projected for completion in Summer 2014 and therntunnel commissioning for service is planned in Fall 2014. This paper will describe some of the key challengesrnencountered during the project construction phase and how they were successfully addressed and managed byrnthe project team. Some of the most significant challenges included a scarcity of experienced tunnel labor forrnconventional mining; very heavy groundwater inflows; difficult tunnel excavation including squeezing groundrnconditions; and gassy tunneling conditions which led to reclassification by CalOSHA during construction.
机译:位于加利福尼亚州阿拉米达县的新艾文顿隧道是桑弗朗西斯科水系统改善计划的重要组成部分。 3.5英里隧道的开采始于2011年3月,于2013年10月完成。预计最终衬砌的安装将于2014年夏季完成,并计划于2014年秋季进行隧道的服务调试。本文将介绍在此期间遇到的一些关键挑战项目建设阶段以及项目团队如何成功解决和管理它们。一些最重大的挑战包括缺乏经验丰富的隧道工人进行常规采矿。大量地下水流入;困难的隧道开挖,包括挤压地面条件;以及瓦斯涌入的隧道条件,导致CalOSHA在施工期间对其进行了重新分类。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号