首页> 外文会议>North American tunneling 2014 proceedings >Istanbul Strait Road Tube Crossing Project: Independent Design Verification Engineer’s Perspective
【24h】

Istanbul Strait Road Tube Crossing Project: Independent Design Verification Engineer’s Perspective

机译:伊斯坦堡海峡公路穿越项目:独立设计验证工程师的观点

获取原文
获取原文并翻译 | 示例

摘要

The iconic Istanbul Strait Road Tube Crossing Project (Eurasia Tunnel) will ease trafficrncongestion over the Bosphorus Strait separating Europe from Asia. Part 2 of the project is approximatelyrn3.36 miles (5.40 km) long and includes, among other structures, 2.1 miles (3.4 km) of a bored tunnel under thernBosphorus Strait and 0.62 mile (1 km) of twin NATM tunnels on the Asian side. The region’s variable geology,rnhydrology and propensity for seismic activity, combined with high water pressure and large-diameter/doubledeckrntunnel configuration, make the Eurasia Tunnel one of today’s most challenging and complex projectsrnunder construction.rnThe paper focuses on the main features of the project’s Part 2 and its significant challenges from thernperspective of independent design verification (IDV) engineer. It also outlines the IDV review process and itsrnbenefits to the project.
机译:标志性的伊斯坦布尔海峡公路过马路项目(欧亚大陆隧道)将缓解博斯普鲁斯海峡将欧洲与亚洲分隔开的交通拥堵。该项目的第2部分大约长3.36英里(5.40公里),包括在博斯普鲁斯海峡下的无聊隧道2.1英里(3.4公里)和亚洲一侧的0.62英里(1公里)双NATM隧道。 。该地区具有可变的地质,水文和地震活动倾向,再加上高水压和大直径/双层甲板隧道构造,使欧亚大陆隧道成为当今施工中最具挑战性和最复杂的项目之一。本文着眼于该项目的主要特点2及其来自独立设计验证(IDV)工程师的重大挑战。它还概述了IDV审核过程及其对项目的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号