首页> 外文会议>North American tunneling 2014 proceedings >Rock Mass Characterization and Initial Support Performance of the Caldecott Tunnel Fourth Bore, San Francisco Bay Area, California
【24h】

Rock Mass Characterization and Initial Support Performance of the Caldecott Tunnel Fourth Bore, San Francisco Bay Area, California

机译:加利福尼亚旧金山湾区Caldecott隧道第四钻孔的岩体表征和初始支撑性能

获取原文
获取原文并翻译 | 示例

摘要

The Caldecott Tunnel Fourth Bore was mined using Sequential Excavation Method (SEM)rntunneling. Rock mass characterization was based on observations made during excavation and initial supportrnperformance was determined through daily surveying of monitoring points. Rock mass conditions observedrnduring excavation were often better than anticipated by the GBR and the design, and often led to classificationsrnat least one Ground Class better than anticipated in the design distribution. This paper provides a summary ofrnthe rock mass characterization as encountered during excavation as well as comparison of the performance ofrnthe rock mass and initial support systems relative to that anticipated by the design.
机译:Caldecott隧道第四钻孔是使用顺序开挖法(SEM)隧道掘进的。岩体的表征基于开挖过程中的观察结果,并通过每天对监测点进行勘测来确定初始支护性能。在开挖过程中观察到的岩体条件通常比GBR和设计所预期的要好,并且经常导致至少比设计分布中所预期的要好至少一个地类的分类。本文总结了开挖过程中遇到的岩体特征,并比较了岩体和初始支撑系统相对于设计预期的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号