【24h】

Box jacking in Boston

机译:波士顿顶箱

获取原文
获取原文并翻译 | 示例

摘要

The $10.8 billion Central Artery/Tunnel Project in Boston, Massachusetts is currently the largest infrastructure project in the United States. The purpose of the project is to replace Boston's aging, elevated central highway system with a modern, underground expressway with increased traffic capacity. A major element of the project is the rebuilding of the South Bay Interchange for Interstates I-90 and I-93, and includes the extension of the existing I-90 route under the track system leading into Boston's South Station Railway Terminal. This paper will discuss design and construction aspects of the I-90 highway tunnel sections being built under the South Station tracks using tunnel jacking and ground freezing techniques.
机译:耗资108亿美元的马萨诸塞州波士顿中央动脉/隧道项目目前是美国最大的基础设施项目。该项目的目的是用交通量增加的现代化地下高速公路代替波士顿老化的高架中央高速公路系统。该项目的主要内容是重建州际I-90和I-93州的南湾立交桥,并包括在通往波士顿南站铁路枢纽的轨道系统下扩展现有的I-90路线。本文将讨论使用隧道顶进和地面冻结技术在南站轨道下建造的I-90公路隧道路段的设计和施工方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号