首页> 外文会议>New Frontiers in Stellar Interferometry pt.1 >The VLTI Auxiliary Telescopes; commissioning of AT1
【24h】

The VLTI Auxiliary Telescopes; commissioning of AT1

机译:VLTI辅助望远镜; AT1的调试

获取原文
获取原文并翻译 | 示例

摘要

The Very Large Telescope Interferometer (VLTI) that currently combines the four VLT 8.2-m Unit Telescopes (UTs) is now being equipped with its dedicated array of Auxiliary Telescopes (ATs). This array includes four 1.8-m telescopes which can be relocated on thirty observing stations distributed on the top of the Paranal Observatory. This array, albeit less sensitive than the array of UTs, is a key element for the scientific operation of the VLTI. After more than five years of design, development, manufacturing and extensive testing in Europe by the company AMOS (Belgium), the first AT arrived on Paranal in October 2003 where it was re-assembled in two months. This was followed by the final testing on the sky, the so-called 'commissioning', that took place in January and February 2004. This paper describes the recent activities from the delivery of AT1 in Europe up to its commissioning at Paranal. It presents a few results from the commissioning and reports the achieved performance. The status of the other ATs is also briefly described.
机译:当前结合了四个VLT 8.2米单位望远镜(UT)的超大型望远镜干涉仪(VLTI)现在配备了专用的辅助望远镜(AT)阵列。这个阵列包括四个1.8米的望远镜,可以将其重新放置在分布在副天文台顶部的30个观测站上。该阵列尽管比UT阵列灵敏,但却是VLTI科学操作的关键要素。在由AMOS公司(比利时)在欧洲进行了超过五年的设计,开发,制造和广泛测试之后,第一台AT于2003年10月到达Paranal,并在两个月内进行了重新组装。接下来是2004年1月和2004年2月进行的最后一次空中测试,即所谓的“调试”。本文介绍了从AT1在欧洲交付到在Paranal调试,最近的活动。它提供了调试的一些结果并报告了已实现的性能。还简要描述了其他AT的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号