【24h】

FLOOD RISK MANAGEMENT FOR SETTING PRIORITIES IN DECISION MAKING

机译:制定决策优先级的洪水风险管理

获取原文
获取原文并翻译 | 示例

摘要

Risk management as a tool for decision making has found more and more acceptance among scientists, and even for planners of flood protection systems. However, a shortcoming of this approach is that at present it only considers risk cost as management tool. It is at present the basis for most risk based approaches, which start with hazard maps, which can be prepared, in conjunction with Digital Terrain Models (DGMs) and geographical information system, if the necessary basic hydrological and topographical data are available. In fact, in many areas and in many countries it has become good practice to develop maps based on flood areas for different exceedance probabilities, with flood zoning as a preferred information for preparing the public for floods.
机译:作为决策工具的风险管理已在科学家中,甚至在防洪系统规划者中越来越受到认可。但是,该方法的缺点是目前仅将风险成本作为管理工具。目前,这是大多数基于风险的方法的基础,如果有必要的基本水文和地形数据,则可以从灾害图开始,结合数字地形模型(DGM)和地理信息系统准备灾害图。实际上,在许多地区和许多国家/地区,以洪水区域为基础,针对不同的超标概率开发地图已成为一种良好做法,洪水分区是公众为洪水做准备的首选信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号