首页> 外文会议>National Light Rail Transit Conference pt.2; 20031116-20031118; Potrland,OR; US >Procurement of Federal Property for Light Rail Transit Case Study of the Minneapolis Hiawatha Line
【24h】

Procurement of Federal Property for Light Rail Transit Case Study of the Minneapolis Hiawatha Line

机译:明尼阿波利斯Hiawatha线轻轨交通案例中的联邦财产采购

获取原文
获取原文并翻译 | 示例

摘要

As in many other cities around the United States, bringing the first light rail transit line in Minneapolis to reality was, and still is, fraught with many challenges. The Metropolitan Council, which will operate the line, and the Minnesota Department of Transportation, which is building the line, have dealt with tight budgets, compressed time lines, lawsuits, and continued political opposition. Other starter lines have faced all of these problems. But one of the unique challenges that faced the Hiawatha Project Office was the acquisition of federal property through the Fort Snelling military reservation. To acquire the 1.5 mi of alignment through Fort Snelling, properly exchange agreements were negotiated with five separate military services and federal agencies. The procedures followed to develop each of these agreements and the compensation provided in exchange for the land varied by agency. The process of acquiring federal property will be described, and some important lessons learned from the Minneapolis experience will be highlighted.
机译:与美国其他许多城市一​​样,使明尼阿波利斯的第一条轻轨运输线成为现实,仍然充满着许多挑战。将运营该线路的大都会委员会以及正在建设该线路的明尼苏达州交通部已经处理了预算紧张,时间紧迫的诉讼,诉讼以及持续的政治反对派。其他起跑线也面临所有这些问题。但是,希瓦莎项目办公室面临的独特挑战之一是通过斯奈林堡军事保留地获得联邦财产。为了通过斯奈林堡获得1.5英里的对准线,已与五个独立的军事部门和联邦机构协商了适当的交换协议。制定这些协议所遵循的程序以及为交换土地而提供的补偿因代理机构而异。将描述获取联邦财产的过程,并将着重介绍从明尼阿波利斯的经验中学到的一些重要经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号