首页> 外文会议> >World Longest Expandable Open Hole Clad Open Hole Liner with Swelling Elastomer Deployed in Yibal Horizontal Well
【24h】

World Longest Expandable Open Hole Clad Open Hole Liner with Swelling Elastomer Deployed in Yibal Horizontal Well

机译:部署在伊巴尔水平井中的世界上最长的具有膨胀弹性体的可扩展裸眼复合层和裸眼衬管

获取原文
获取原文并翻译 | 示例

摘要

PDO has successfully installed the longest open hole clad and longest open hole liner with swelling elastomers in a Yibal horizontal oil producer well. The main objective of installing expandable liner combined with swelling elastomers was to efficiently isolate the water producing features/fractures that are dominating majority of the 957m of reservoir section. rn This one horizontal well replaces five vertical wells at cost of two vertical wells. In addition to the cost reduction, the surface location construction constraints in the field do not allow drilling five wells from different locations to reach the required targets. Therefore the introduction of such well type allows drilling five well targets from one surface location. rn The overall value Drivers for drilling and completing this well with expandable liners/clads with swelling elastomers were as follows: rn▪ Restore some symmetry to the water flood process for proper surveillance and management. rn▪ Vertical wells are uneconomic for establishing symmetry as they are only good for targeting oil sweet spots (reduced number of wells as a result). rn▪ Allow for more & longer perforation intervals. rn▪ Proper selective zonal isolation. rn The bigger ID provided by the expandable tubular allows for running larger OD smart completion to control the production from specific perforation zones. rn Initially 305 m of 5-1/2' x 6-1/8', Open Hole Clad was set at TD (2541 m), then a 687 m Open Hole Liner was tied back to the 7' liner. rn Based on 6 arm caliper log, both expandable liner and clad were coated with 4mm and 5.5 mm thick swelling elastomer to achieve optimum annular sealing, covering total length of 425 m isolated interval. Initially perforated well with 4 intervals to produce from different zones. There are further 7 ‘blank' intervals between elastomer sections for future perforations. rn The paper covers a brief background of the Yibal field, detailed technical planning and execution phases for drilling and completing the well with expandable technology & application of swelling elastomers.
机译:PDO已在Yibal水平采油井中成功安装了最长的裸眼包层和最长的具有膨胀弹性体的裸眼衬管。安装与膨胀弹性体结合的可膨胀衬管的主要目的是有效地隔离占水库段957m绝大部分的产水特征/裂缝。 rn此一口水平井以五口垂直井取代了两口垂直井。除了降低成本外,现场的地面施工限制还不允许从不同位置钻探五口井以达到所需的目标。因此,这种井类型的引入允许从一个地面位置钻出五个井目标。总体价值使用膨胀的弹性体膨胀的衬里/包层进行钻探和完井的动因如下:rn■恢复注水过程的对称性,以进行适当的监视和管理。 rn■垂直井对于建立对称性是不经济的,因为它们仅适合于瞄准含油甜点(因此减少了井数)。 rn■允许更多和更长的穿孔间隔。 rn■适当的区域选择性隔离。 rn可膨胀管提供的较大ID允许运行较大的OD智能完井,以控制特定射孔区的产量。 rn最初将305 m的5-1 / 2'x 6-1 / 8'的裸眼包层设置在TD(2541 m)处,然后将687 m的裸眼衬里绑回7'衬里。 rn基于6臂卡尺测井仪,可膨胀衬管和包层均涂有4mm和5.5mm厚的膨胀弹性体,以实现最佳的环形密封,覆盖了425 m的隔离间隔总长度。最初有4个间隔的射孔井,可从不同区域开采。弹性体部分之间还有7个“空白”间隔,以备将来打孔。 rn本文涵盖了Yibal油田的简要背景,详细的技术计划和执行阶段,以及可膨胀技术和溶胀弹性体的应用,以完成该井的钻井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号