Time Control in Mega Construction Programme Management Based on Meta-synthesis: Case Study of Expo 2010 Shanghai China

机译:基于META合成的MEGA建筑计划管理时间控制:2010年上海世博会案例研究

获取原文

摘要

The planning and implementation of Expo 2010 Shanghai China is a very complex mega- program system, and all missions and activities must be effectively coordinated, especially in time control. How to establish time control system effectively and efficiently is one of core issues. Meta-synthesis is a theory of complexity sciences which is put forward by Qian Xuesen, China. Based on this theory, the paper studies on how to control time objectives system of Expo2010. Firstly, by a structured approach,the time objectives system is broken down three streams, which are exhibition & participation, construction & operation preparation, and promotion & event. Under this breakdown structure, the paper analyzes the construction period subsystem. Secondly, by MSM (Multistage network planning method), three hierarchical time plan networks are put up, which are milestones for the Bureau of Shanghai World Expo Coordination, outline plans for construction program management headquarters which is representative of the government, and detailed plans for project management departments, and then the construction period subsystem is realized in Enterprise Project Management System (ie. Primavera P3) . Besides, organization and management measures are described. This systematic method of time control in mega construction programme management could be used for other large-scale, global, non-commercial Expo, or other similar programs.
机译:2010年上海世博会的规划和实施是一个非常复杂的大型计划制度,必须有效地协调所有任务和活动,特别是在时间控制。如何有效和有效地建立时间控制系统是核心问题之一。 Meta合成是中国Xueenen,中国的复杂性科学理论。基于该理论,论文如何控制Expo2010时机系统的研究。首先,通过结构化方法,时间目标系统被打破了三个流,这是展览和参与,建筑和操作准备和促销和活动。在这种击穿结构下,本文分析了施工期子系统。其次,通过MSM(多级网络规划方法),提出了三个层次时间计划网络,这是上海世博会协调局的里程碑,概要计划,施工方案管理总部,该总部是政府,以及详细的计划项目管理部门,然后在企业项目管理系统中实现了施工期间子系统(即Primavera P3)。此外,还描述了组织和管理措施。这种在巨型建筑计划管理中的这种时间控制方法可以用于其他大规模,全球,非商业博览会或其他类似程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号