Commissioning and Operation of DC Water's New CSO Tunnel System During One of the Wettest Years on Record

机译:DC水新的CSO隧道系统在历史上最潮湿的岁月中的调试与运行

获取原文

摘要

In March 2018, DC Water achieved a major milestone in the implementation of its Combined Sewer Overflow (CSO) Long Term Control Plan, also known as the DC Clean Rivers Project (DCCR), with the completion and commissioning of the first phase of the Anacostia River Tunnel (ART) System. By placing the ART system into operation, DC Water met a major milestone for delivery of CSO control facilities per the terms of its Consent Decree. This paper presents a discussion on coordination of contractors, engineers, and Owner staff during the commissioning of the system and the performance during the first year of operation, which happened to be one of the wettest years on record for the District of Columbia.
机译:2018年3月,DC水在实施其组合下水道溢出(CSO)长期控制计划中实现了一个主要的里程碑,也称为DC Clean Rivers项目(DCCR),完成和调试Anacostia的第一阶段河隧道(艺术)系统。通过将艺术制度放入运行中,DC水通过其同意法令的条款提供了一个主要的里程碑,用于提供CSO控制设施。本文介绍了在制度调试期间协调承包商,工程师和所有者工作人员的讨论以及在运营的第一年的表现中,这恰好是哥伦比亚地区记录的最潮湿岁月之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号