FORENSICS OF DIFFICULT GROUND CONDITIONS LEADING TO ADVANCED SOLUTIONS FOR RECOVERY OF AN ABANDONED TUNNEL PROJECT

机译:难以实现康涅尔项目恢复先进解决方案的难以基础条件的取证

获取原文

摘要

A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200 feet) long tunnel planned to serve as a 4-million cubic meters (1-billion gallon) per day capacity river outfall for treated wastewater. Some 808-meters (2,650-feet) section of the constructed tunnel, TBM, and all other tunneling equipment were completely flooded with hydrogen sulfide laden artesian groundwater. The subsequent pumping and tunnel recovery efforts were unsuccessful and the tunnel was abandoned. In the end, the construction contract was terminated and options to redesign and reconstruct the project were re-evaluated to maximize the use of already constructed tunnel facilities such as the construction access and intermediate shafts and six outfall diffuser shafts in the river.
机译:一系列难度的地面条件导致高地下水流入和危险气体侵入突然停止施工6.4米(21英尺)的成品直径,并计划为400万立方米的长隧道(6200英尺) 10亿加仑)每天容量河排水口处理过的废水。建造隧道,TBM和所有其他隧道设备的大约808米(2,650英尺)部分完全用硫化氢Laden Artesian地下水完全淹没。随后的泵送和隧道恢复工作是不成功的,并且隧道被遗弃。最后,终止施工合同并重新评估和重建项目的选择,以最大限度地利用已经构造的隧道设施,例如建筑物和中间轴和河流中的六个出口扩散器轴。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号