首页> 外文会议>Port development in the changing world conference >Have Batter Piles Gotten a Bad Rap in Seismic Zones?(Or Everything You Wanted to Know About Batter Piles But Were Afraid to Ask)
【24h】

Have Batter Piles Gotten a Bad Rap in Seismic Zones?(Or Everything You Wanted to Know About Batter Piles But Were Afraid to Ask)

机译:有击球桩在地震区中得到了一个糟糕的说唱吗?(或者你想要了解击球桩的一切,但害怕问)

获取原文

摘要

Under most circumstances, plumb pile systems are more economical and are usually the system of choice for piers and wharves subject to seismic loading. However, there are situations where batter piles are desirable, such as under high service-level lateral loading conditions or where the new structure has to be compatible with an existing batter pile structure. For these situations, using displacement design with carefully-detailed batter piles may result in a significant project savings compared to a force-based seismic design method. This paper reviews the basic concepts of displacement design. Insight is offered on the behavior of batter piles using a simplified displacement method to show why batter pile structures are vulnerable to seismic loading if designed using a force-based method. Sample details and a design procedure for a proposed system are presented.
机译:在大多数情况下,铅桩系统更经济,通常是码头载荷的码头和码头的选择系统。 然而,存在面糊桩的情况,例如在高服务水平横向装载条件下或新结构必须与现有的面糊桩结构兼容。 对于这些情况,与小心详细的击球桩使用位移设计可能会导致与基于力的地震设计方法相比的重大项目节省。 本文评论了位移设计的基本概念。 使用简化的位移方法提供了击球桩的行为,以显示为什么使用基于力的方法设计,为什么击球桩结构容易受到地震加载的影响。 提出了一个提出系统的示例细节和设计过程。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号