Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria

机译:尼日利亚建筑工程项目成本超支原因再探讨

获取原文

摘要

The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. The total cost of construction in normal circumstances is expected to be the sum of materials, labour, site overheads, eEquipment/plant, head office cost and profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for. To the end user, the added costs are passed on as higher rental/ lease costs or prices. The aim of this study is to appraise the causative factors of cost overrun on building construction project in the Nigerian construction industry. This study was carried out using quantitative research method. This involved the collection of data relating to the research study through questionnaires prepared using literature search and carried out among professionals in the construction industry such as Architects, Builders, Engineers, Project Managers and Quantity Surveyors. Random sampling technique was employed in selecting the 156 respondents for the research study within the South Western region of Nigeria. Data retrieved were analysed using Percentile, Mean item Score and Kruskal-Wallis H-test. Findings revealed that additional cost (e.g. variations), poor financial control on site, contract management, previous experience of contractor, wrong estimation method are the major factors leading to cost overrun on building construction projects. The study concluded that construction projects experience cost overrun as a result of negligence in one way or the other by all the stakeholders involved in the construction process from inception to final completion.
机译:对各类建筑的需求不断增长,加上货币供应紧张,给建筑业带来了削减成本的巨大挑战。在正常情况下,施工总成本预计为材料、劳动力、现场管理费用、设备/厂房、总部成本和利润之和,但在世界许多地区,尤其是尼日利亚,还有其他成本需要考虑。对于最终用户,增加的成本会作为更高的租金/租赁成本或价格转嫁给他们。本研究的目的是评估尼日利亚建筑业建筑施工项目成本超支的原因。本研究采用定量研究方法。这涉及通过使用文献检索编制的问卷收集与研究相关的数据,并在建筑行业的专业人士(如建筑师、建筑商、工程师、项目经理和工程量测量师)中进行。在尼日利亚西南部地区,采用随机抽样技术选择156名受访者进行研究。检索到的数据使用百分位数、平均项目分数和Kruskal-Wallis H检验进行分析。调查结果显示,额外成本(如变更)、现场财务控制差、合同管理、承包商之前的经验、错误的估算方法是导致建筑施工项目成本超支的主要因素。该研究的结论是,从施工开始到最终完工,所有参与施工过程的利益相关者都以这样或那样的方式疏忽,导致施工项目成本超支。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号