首页> 外文会议>International Conference on Electricity Distribution >Experiences in installation and operation for a sub-station control and protection system
【24h】

Experiences in installation and operation for a sub-station control and protection system

机译:子站控制和保护系统的安装和操作的经验

获取原文

摘要

The authors describe how Iberdrola, the largest of Spain's private electric power utilities has recently, in conjunction with the Electrotecnica Arteche Hermanos Company and the Basque Country University, completed the installation of an integrated control and protection system at its Castro la Plana transformer substation. The purpose of the present paper is to describe the most salient aspects of its commissioning, and the advantages achieved in the operation and maintenance of this new installation, with special reference to those aspects which have involved an improvement over installations that are based on conventional control and protection systems.
机译:该作者描述了最近,西班牙的私人电力公用事业最大的近日,最近,最近的私人电力公用事业公司以及巴斯克乡村大学的私人电力公用事业最多,在Castro La Plana变电站上完成了一体化控制和保护系统的安装。 本文的目的是描述其调试的最大方面,以及在这一新安装的运行和维护中实现的优势,特别参考这些方面,这些方面涉及基于传统控制的安装的改进 和保护系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号