首页> 外文会议>AEIT HVDC International Conference >A New Milestone In Pan-European Network Leveraging On Shared Infrastructures
【24h】

A New Milestone In Pan-European Network Leveraging On Shared Infrastructures

机译:泛欧洲网络的新里程碑,利用共享基础设施

获取原文

摘要

The focus of this paper is on the Piedmont-Savoy link, $mathrm{a}pm 320$ kV HVDC interconnection between the Italian and French network, which reinforces the Pan-European electricity network. This project is an example of the feasibility of synergy with existing highways and tunnels. However, due to peculiarities of the link, numerous system design and installation challenges have been overcome during the project and are presented in this paper.
机译:本文的重点是Piedmont-Savoy Link,$ Mathrm {A} PM 320 $ kV HVDC互连,意大利和法国网络之间加强了泛欧电网。 该项目是现有高速公路和隧道协同作用的可行性示例。 然而,由于链路的特点,在项目期间克服了许多系统设计和安装挑战,并在本文中提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号