DFIG-based Windfarm Starting Connected to a Weak Power Grid

机译:基于DFIG的Windfarm启动连接到弱电网

获取原文

摘要

Starting and energization of windfarms has always been done under strong grid conditions. With the increase in blackouts and desire to run parts of the system in island mode, it is necessary to examine the starting of windfarms under different system conditions. This work provides an analysis into the starting of DFIG based windfarms under weak grid conditions including using a diesel gen-set and a hydropower plant. The starting procedure of the DFIG based wind turbine has been explored afterwhich multiple wind turbines have been started simultaneously. It is assumed that the windfarm substation will have a dump load to absorb excess power produced by the windfarm. The above study is conducted using MATLAB/SIMULINK. Results shows that the type and strength of source influences the starting process of windfarm and this is necessary in determining the appropriate moment to energize a windfarm after a wide scale blackout.
机译:Windfarms的启动和通电一直在强大的网格条件下进行。随着停电和欲望在岛屿模式下运行系统的欲望,有必要在不同的系统条件下检查Windfarms的开始。这项工作在弱电网条件下,在基于DFIG的WindFarms的开始,包括使用柴油机和水电厂。已经探索了DFIG基于风力涡轮机的启动程序,其中多个风力涡轮机同时启动。假设Windfarm变电站将具有卸载负载以吸收由风蝇产生的过量的功率。上述研究是使用MATLAB / SIMULINK进行的。结果表明,源的类型和强度影响了风蝇的起始过程,这是在确定范围内停电后适当的时刻能够激励风洞的时刻是必要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号