首页> 外文会议>Transportation Geotechnics and Geoecology >Development of tunnel dismantling machine (TDM) in an underground railway project
【24h】

Development of tunnel dismantling machine (TDM) in an underground railway project

机译:地下铁路工程中隧道拆卸机(TDM)的开发

获取原文

摘要

The MTR West Island Line (WIL) project in Hong Kong involved demolishing and backfilling a 132 m section of the existing Overrun Tunnel (ORT) through complex geology beneath densely populated urban area, in order to enable subsequent excavation of the WIL Down-track (westbound) running tunnel by tunnel boring machine (TBM). To tackle the challenge while minimizing construction risks, a bespoke tunnel dismantling machine (TDM) was innovated. The TDM worked backwards from the operational railway interface inside the ORT to remove each lining segment ring under 2.8 bar compressed air pressure, sprayed shotcrete lining for temporary support, and backfilled the remaining void left underground. The crew behind the demolition chamber of TDM worked under atmospheric pressure. Part of the backfilled tunnel was then re-excavated by slurry TBM to form the re-aligned WIL Down-track running tunnel. The TDM was able to accomplish the works safely and led to the successful opening of WIL. This paper explicates the development of the world-wide unprecedented TDM and the construction process of ORT demolition.
机译:香港的地铁西岛线(WIL)项目涉及通过密集的城市地区下面的复杂地质拆除和回填现有的超支隧道(ORT)的132米,以便随后挖掘WIL下行轨道( Westbound)隧道镗床(TBM)跑步。为了解决挑战,同时最大限度地减少施工风险,创新了定制隧道拆卸机(TDM)。 TDM从ORT内部的操作铁路接口向后工作,以除去2.8杆压缩空气压力下的每个衬里段环,喷洒喷射丝网循环,并将其余的空隙留在地下。 TDM拆卸室后面的船员在大气压下工作。然后通过Slurry TBM重新挖掘回填隧道的一部分,以形成重新对齐的无机轨道运行隧道。 TDM能够安全地完成作品,并导致了威尔的成功开放。本文阐述了世界范围内前所未有的TDM的发展和ORT拆迁的建设过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号