首页> 外文会议>Applied Energy Symposium and Forum >Performance enhancement of an inline cross-flow hydro turbine for power supply to water leakage monitoring system
【24h】

Performance enhancement of an inline cross-flow hydro turbine for power supply to water leakage monitoring system

机译:漏水监测系统电源内联交流水轮机的性能提升

获取原文

摘要

Water leakage monitoring system is essential for the urban water supply,but it is a great challenge to ensure stable and reliable power supply for this system.In this study,an inline cross-flow turbine was proposed to harvest hydropower from the water pipes.A numerical investigation was conducted to study the effects of blocks on the turbine performance.The simulation results indicated that the proposed upstream and downstream blocks can act as nozzle and diffuser in traditional cross-flow turbine to enhance the flow velocity and pressure difference through the impeller,so the turbine performance can be improved.The maximum output power of the turbine can research 136W when the TSR is 1.2 and the water head loss through the water turbine is in the range of 3.45m-3.75m water head,which has little negative impact on the normal water supply.
机译:漏水监测系统对城市供水至关重要,但确保该系统的稳定可靠的电源是一个巨大的挑战。本研究中,提出了一种从水管收获水电站的内联交流涡轮机。 进行了数值调查以研究块对涡轮机性能的影响。模拟结果表明,所提出的上游和下游块可以充当传统横流涡轮机中的喷嘴和扩散器,以增强通过叶轮的流速和压力差, 因此,可以提高涡轮机性能。当TSR为1.2时,涡轮机的最大输出功率可以研究136W,水涡轮机的水头损耗在3.45m-3.75m的水头范围内,这几乎没有负面影响 在正常供水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号