首页> 外文会议>NASTT s No-Dig Show Conference >Protecting a National Treasure: Rehabilitation of East Fort Ave. Water Main Fort McHenry, MD
【24h】

Protecting a National Treasure: Rehabilitation of East Fort Ave. Water Main Fort McHenry, MD

机译:保护国宝:东堡大道的康复。水主堡MCHENRY,MD

获取原文

摘要

A 20-ft water main that was serving as the primary water source to supply Fort McHenry was putout of service due to a 650-ft section of steel pipe that was located under a bridge, running over aCSX rail yard. The leaking main was causing washouts under the tracks and disrupting service.The decision was made to shut down the line and use a smaller alternate source of potable water.With the heavy commercial traffic over the bridge and normal expansion and contraction on abridge in New England Temperatures’ there was a reluctance to use CIPP or any other ridgedsolution. The contractor was recently certified to install a unique form of a flexible Kevlar? linerComposite system and advised the client this was their best option. The pipe owner agreed. Servicewas re-established in two days and put back in operation a week later protecting Fort McHenry.
机译:将一个20英尺的水主要供应作为主要水源供应米亨的主要水源由于位于桥梁下方的钢管650英尺的钢管部分,延迟了CSX铁路码。泄漏的主要导致轨道下的冲洗和扰乱服务。决定关闭了线路,并使用较小的替代水来源。随着巨大的商业交通,在桥上和正常的扩张和收缩在新英格兰的桥梁温度'有不愿意使用cip或任何其他脊解决方案。承包商最近认证安装独特的灵活Kevlar形式吗?衬垫复合系统并建议客户这是他们最好的选择。管主同意。服务在两天内重新建立,并在一周后恢复运营,以后保护米亨堡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号