首页> 外文会议>International Forum on Research and Technology for Society and Industry >Preliminary Monitoring and Route Location of Macro Energetic Project - Nord Stream 2 Marine Gas Pipeline
【24h】

Preliminary Monitoring and Route Location of Macro Energetic Project - Nord Stream 2 Marine Gas Pipeline

机译:宏观生能项目的初步监测与路由位置 - Nord Stream 2海洋气体管道

获取原文

摘要

Nord Stream 2 Company carried out an Environmental Impact Assessment (EIA) to compare alternative location routes of the Russian part of the project Nord Stream 2 gas pipeline in April 2017 in Russia. Lengths of the alternative routes for new marine gas pipeline varied from 1230 km to 1260 km. During preliminary monitoring of natural and anthropogenic restrictions to construction and operation Nord Stream 2 for Narva route and Kolganpya route were observed. Preliminary Environmental Impact Assessment, realized for dredging and backfilling works, was made for planktonic and zoobenthos organisms, which are essential feeding resources for fish communities. N arva route was considered more appropriate taking into account some indicators of dredging and backfilling works and magnitude of impact on the environment.
机译:Nord Stream 2公司进行了环境影响评估(EIA),以比较俄罗斯项目NORD Street 2天然气管道的俄罗斯部分俄罗斯群体的替代位置路线。新海洋气体管道的替代路线的长度从1230公里变为1260公里。在初步监测对建筑和运作的自然和人为限制的初步监测,观察到纳尔瓦途径和Kolganpya路线的北欧溪流2。用于疏浚和回填工程的初步环境影响评估是针对浮游和血症生物制作的,这是鱼群的必要喂养资源。 NARVA路线认为更适合考虑到一些疏浚和回填工程的指标和对环境影响的程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号