首页> 外文会议>IEEE Conference on Power Engineering and Renewable Energy >A Power Quality Improvement Study in Central Java Indonesia
【24h】

A Power Quality Improvement Study in Central Java Indonesia

机译:爪哇印度尼西亚中部的电力质量改进研究

获取原文

摘要

This paper proposes possible solutions to mitigate voltage sag problem in Kaliwungu Industrial Center, Central Java, Indonesia. In the last three years, there were 17 voltage sag occurrences which violate the ITIC curve. In Central Java area, Kaliwungu in particular, suffers from unbalanced deep voltage sags due to application of Y-Y connected transformers from the upstream 500 kV backbone to the 380 V low voltage distribution. Thus, voltage sag due to unbalanced fault elsewhere in the Central Jawa grid will directly pass to the consumer appliances in Kaliwungu Industrial Center. Several relatively low-cost solutions have been proposed to mitigate this situation. The proposed solutions are to modify the transformer winding connections and the grounding system in the substation that feeds directly the area. Simulated results show the effectiveness of the proposed solution.
机译:本文提出了在印度尼西亚中爪哇省Kaliwungu工业中心缓解电压下垂问题的可能解决方案。在过去的三年中,有17个电压凹陷突出的突出曲线。在中爪哇地区,KaliWungu特别涉及不平衡的深度凹凸,因为y-y连接的变压器从上游500 kV骨架的应用到380V低压分布。因此,由于中央Jawa网格的其他地方的不平衡故障导致的电压凹陷将直接通向卡利永阀工业中心的消费设备。已经提出了几种相对低成本的解决方案来减轻这种情况。所提出的解决方案是在直接馈送该区域的变电站中修改变压器绕组连接和接地系统。模拟结果显示了所提出的解决方案的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号