Manufacturing Enhancement through Reduction of Cycle Time using Different Lean Techniques

机译:通过使用不同的精益技术减少循环时间来制造提高

获取原文

摘要

In recent manufacturing system the most important parameters in production line are work in process, TAKT time and line balancing. In this article lean tools and techniques wereimplemented to reduce the cycle time. The aim is to enhance the productivity of thewater pump pipe by identifyingthe bottleneck stations and nonvalueadded activities. From the initial time study thebottleneck processeswere identified and then necessary expanding processeswere also identified for the bottleneck process. Subsequently the improvement actions have been established and implemented using different lean tools like value stream mapping, 5S and line balancing.The current state value stream mappingwas developed to describe the existing status and toidentify various problem areas. 5S was used toimplement the steps to reduce the process cycle time andunnecessary movements of man and material. The improvement activities wereimplemented with required suggested and the future state value stream mapping was developed. From the results it wasconcluded that the total cycle time was reduced about290.41 seconds and the customer demand has been increased about 760 units.
机译:在最近的制造系统中,生产线中最重要的参数是过程中的工作,TAGT时间和线路平衡。在本文中,精益的工具和技术凭借缩短循环时间。该目的是通过识别瓶颈站和非瓦尔寿服的活动来提高水泵管的生产率。从初始时间研究,所识别的Bottleeneck流程,然后必须为瓶颈进程确定必要的扩展流程。随后,已经使用不同的精益工具建立和实现了改进操作,如值流映射,5s和线路平衡。当前状态值流映射开发用于描述现有状态和概念各种问题区域。使用5S来实现以下步骤,以减少人和材料的过程循环时间Andnendeary运动。开发了所要求建议和未来状态值流映射的改进活动。从结果中,它是持续的,总循环时间减少约290.41秒,并且客户需求增加了大约760个单位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号