首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >Breaking the Challenge of Brownfield by Delivering 10,000 BOPD withImplementation of Gas Lift Supply Strategy.The Success Story of FacilityUpgrading,Integration and Optimization in Oil Field
【24h】

Breaking the Challenge of Brownfield by Delivering 10,000 BOPD withImplementation of Gas Lift Supply Strategy.The Success Story of FacilityUpgrading,Integration and Optimization in Oil Field

机译:通过实施燃气升降供应策略的实施方式,通过10,000大胆打破棕区的挑战。油田设施升级,集成和优化的成功故事

获取原文

摘要

Sanga Sanga block has been producing for more than 50 years,with most of the oil production from depletedreservoirs with 60% of base production decline.Extending the wells’lives requires aggressive artificial liftdevelopment both in subsurface and surface.The implementation of gas lift supply strategy is very criticalto fulfil gas lift capacity requirement also with sufficient injection pressure.This paper will describe gaslift supply strategy consisting of facility upgrading,along with integration and optimization of the existingfacility.Thorough project planning and procedures have been established to ensure the optimum oil development.The gas lift facility upgrade consists of three main projects as follows.The first was a major project of anadditional high pressure compressor for gas lift.One unit in the Mutiara field and two rental units in theNilam field have been installed to increase gas lift capacity.The second project was the installation of an interconnected gas lift network to ensure availability andcoverage of gas lift system along from gas lift source to the furthest well location.The last project was theoptimization of the existing production facility,injection facility and trunkline to reduce capital cost.This project was completed as scheduled and successfully delivered 10,000 BOPD in the last four years.It was supported by an additional 27 MMscfd supply from the HP Compressor project as a gas lift source.A length of more than 35 km of gas lift system was completed in 6 producing fields to eliminate gas liftblank spot.Gas lift injection pressure has increased from 300-1000 psig to 1400 to-1800 psig,enablingmore drawdown in the gas lift wells.The interconnection system installed gives two benefits: flexibilityof gas lift source during compressor maintenance and also the distribution of High Pressure and MediumPressure gas.Sanga Sanga also managed to reduce the unit price of the individual gas lift injection facilityby 30% through a bulk procurement strategy,utilization of idle equipment and the modification of existingequipment.
机译:桑加桑加块已生产超过50年,大部分的石油生产从depletedreservoirs与基地生产decline.Extending的wells'lives的60%的要求都在地下和surface.The实施气举供应策略的进取人工liftdevelopment很criticalto完成气升容量的需求也有足够的注射pressure.This本文将描述气举供应策略,包括设施升级,以整合和existingfacility.Thorough项目规划的优化和程序沿着已经建立,以保证最佳的石油开发。气举工具升级包括三个主要项目如下:第一是已经安装,以增加天然气运输能力在珍珠领域anadditional高压压缩机气体lift.One单元和theNilam第二场出租单位的重大项目。第二个项目是一个相互联系的气举网络的安装确保气举系统的可用性andcoverage气举源一起到最远的井位置资讯的最后一个项目是对现有生产设备,注塑设备和干线,以降低资本cost.This项目theoptimization被如期完成,并成功交付万BOPD在过去的四个years.It是由一个额外的27 MMSCFD供给从HP压缩机项目包含在气举系统的超过35公里气体提升source.A长度支撑在6个生产油田完成消除气体liftblank spot.Gas升程喷射压力已经从300-1000磅增加到1400至1800 psig的,enablingmore缩编在安装了气举wells.The互连系统给出了两个好处:压缩机维修期间flexibilityof气举源,而且还高的压力和气体MediumPressure的分布.Sanga桑加还设法通过批量采购ST减少单个气举注射facilityby 30%的单价rategy,闲置设备的利用率和existingequipment的修改。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号