Using E-line Conveyance in Multi-Stage Fracturing to Optimize Efficiency: A Case from Bakken,ND

机译:在多级压裂中使用E-Line传送以优化效率:来自Bakken,ND的案例

获取原文

摘要

Multi-stage'plug-and-perf'operations in the Bakken formation are conventionally performed using pump down wireline operations.However,when a restricted casing ID,coupled with road restrictions,strict budget and time constraints,and a long horizontal section prevented the use of conventional methods,an operator in North Dakota turned to e-line,tractor- based conveyance to get this$9M asset on line. The operator needed to plug and perforate 26 zones from max depth at 21,740 ft up to the upper perforations at 11,830 ft to get the well on line swiftly.However,a 3.5 in.patch at 11,689 ft-11,709 ft meant the ID of the 4 1/2 in.,11.6#casing string was restricted,and thus the 4 1/2 in.plug could not be pumped in safely.Pumping the plug could cause it to set prematurely or get pumped off causing an expensive fishing job.Rig workover was deemed too time consuming due to the number of runs necessary and as a 2 in.coiled tubing(CT)string would only be able to reach about 17,000 ft,this option would have left 10 zones unperforated.To further complicate matters,spring thaw road weight restrictions were in place and the project was already over budget and behind schedule. By turning to e-line tractor conveyance the 26 runs to'plug-and-perf'were completed in just 14 days with no lost time.In addition,the patch was successfully negotiated,the plug set properly and the entire section was perforated.The swift and nimble nature of the e-line technology made it easy to overcome the logistical challenges and helped the operator with their timing and budget issues. This paper will show why using e-line tractor conveyance was the right solution for this intervention where 146,608 ft were tractored with no lost time.
机译:在巴肯形成多stage'plug和 - perf'operations使用抽空有线operations.However,当限制壳体ID,加上道路的限制,严格预算和时间的限制常规进行,并防止了长的水平部分的使用传统方法,在北达科他州的运营商转向电子线,tractor-基于运送到获得此行$ 9M的资产。在11830英尺在21740英尺到上穿孔堵塞和穿孔从最大深度26个区所需要的操作者在11689得到很好上线swiftly.However,3.5 in.patch英尺 - 11709英尺指的4 ID 1/2英寸,11.6#套管柱受到限制,因此,4 1/2 in.plug不能在safely.Pumping待泵送的插头可能导致它过早设置或获取泵出造成昂贵的钓鱼job.Rig修井被认为太耗时间了,由于需要运行的次数和为2 in.coiled油管(CT)字符串只能够达到17,000英尺这个选项会离开10个区unperforated.To问题进一步复杂化,春天解冻的道路重量限制已经到位,该项目已经超出预算和进度落后。通过转向电子线拖拉机运送了26分to'plug-和perf'were在短短14天内,没有丢失time.In除了完成后,该补丁被成功协商,插头设置不当,整个部分被穿孔。雨燕和电子线路技术的灵活的性质使得它容易克服的后勤方面的挑战,并与他们的时间和预算问题帮助运营商。本文将说明为什么使用e-线拖拉机运输是这个干预地方146608英尺被tractored没有失去的时间正确的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号