首页> 外文会议>Renewable Energy World Conference and Exposition >Wind Energy in Mexico: Development and Execution Best Practices
【24h】

Wind Energy in Mexico: Development and Execution Best Practices

机译:墨西哥风能:发展和执行最佳实践

获取原文

摘要

Development of wind projects in Mexico presents several challenges and opportunities that are unique to the Mexican marketplace. High PPA tariffs and a growing energy market attract developers to the Mexican wind market. However, seizing these opportunities requires developers to understand the needs of stakeholders such as Off-takers, CRE (Energy Regulatory Commission), and CFE (State Owned Utility). Some of the critical development challenges include: identifying viable Points of Interconnection, securing PPA's, working with limited small scale wind data, and managing the substation engineering design, review, and approval process. During the construction phase, some of the important challenges include: major equipment importation, EPC planning and reporting, and site safety, security and theft. Lastly, it is important to appreciate the positive influence of the Spanish workforce during Wind Turbine Generator (WTG) installation and the support from CFE during substation testing and start-up.
机译:墨西哥风力项目的发展呈现出几种挑战和墨西哥市场独有的机会。高PPA关税和不断增长的能源市场吸引开发商到墨西哥风电市场。然而,抓住这些机会要求开发人员了解利益相关者的需求,如离职人,CRE(能源监督管理委员会)和CFE(国有效用)。一些批判性发展挑战包括:识别可行的互联点,确保PPA,与有限的小规模风数据一起工作,并管理变电站工程设计,审查和批准过程。在施工阶段,一些重要的挑战包括:主要设备进口,EPC规划和报告,以及现场安全,安全和盗窃。最后,重要的是要欣赏西班牙劳动力在风力发电机(WTG)安装期间的积极影响以及CFE在变电站测试和启动期间的支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号