Blasting Demolition of Brick Concrete Office Building under Complex Environment

机译:复杂环境下砖和混凝土办公楼的爆破拆除

获取原文

摘要

Blasting demolition about office building with mixed structure in downtown under complicated condition is introduced at this paper. This office building was constructed in I960' s by brick & concrete, and it was reinforced and heightened by steel & concrete in following days. The original building was a fourfloor one, and it was heightened to a six-floor one. All the pillars and walls had inner and outer layers, the inner was constructed with brick & concrete, and the outer was reinforced by 20cm steel & concrete material. And steel tension bars which were radial spaced 6 to 8 meters were used to reinforce the building. Because the building was badly constructed as well as low security, the structure of this building was complicated after reinforcing. The office building is an "L" shape structure, only part of the building in east west will be removed, and the left must be well kept wholly and run orderly. The safety of explosion should be higher than usual due to the more complicated condition meanwhile the building is located at the most prosperous district in downtown. Integrated research and comparing about various operating programmes are executed through field survey and computation. Finally the explosion plan is determined that the building is collapsed in place and fallen in one direct, and there are two explosion gaps in the top and bottom respectively. In order to protect the maintained a one meter wide split is cut between the pre-explosion part and the kept one by man work and machine firstly. And blasting parameters are selected properly by careful survey & design and operation. In the explosion split there are two layers, one is inner one with brick structure and the other is outer one with steel structure. While designing detailed computation and tests are carried out The explosive is loaded in both layers individually and shot delay blasting technique is applied, and the building can be separated extremely to minimize the ground shock, thereby the surrounding construction is protected safely. Close body protection and covering main parts are supplied to avoid flying stone after demolition. This operation receives ideal results and the maintained parts and building nearby are protected effectively. After this demolition valuable experiments are obtained for similar complex structure buildings.
机译:本文介绍了与市中心混合结构的办公楼爆破拆迁。这座办公楼是在I960的砖和混凝土中建造的,并且在下面的日子里被钢和混凝土加强和加强。原来的建筑是一个四个,它加剧了六楼。所有支柱和墙壁都有内层和外层,内部用砖和混凝土构造,外部由20cm钢和混凝土材料加固。和径向间隔6至8米的钢张力棒用于加强建筑物。由于建筑物严重构建并低安全性,因此加强后,这座建筑的结构复杂化。办公楼是一个“L”形状的结构,只有东部的建筑物的一部分将被移除,左侧必须完全保持完全持续并有序运行。由于建筑物位于市中心最繁华的地区,爆炸的安全性应高于平常。通过现场调查和计算执行综合研究和比较。最后,确定建筑物的爆炸计划在适当位置并直接下降,顶部和底部有两个爆炸间隙。为了保护维护的保持一米宽的分裂,在爆炸前部门和首先通过人的工作和机器进行了保存。通过仔细的调查和设计和操作正确选择和爆破参数。在爆炸分裂中,有两层,一个是内部砖结构,另一个是具有钢结构的外部。在设计详细的计算和测试的虽然进行了爆炸物,但是在这两层上装入两层,并且施加射击延迟爆破技术,并且建筑物可以非常清零,从而安全地保护周围的结构。提供贴身的身体保护和覆盖主要部件,以避免拆除后的飞行。该操作接收理想的结果,并且附近的维护部件和建筑有效地保护。在该拆迁之后,获得了类似的复杂结构建筑物的宝贵实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号