首页> 外文会议>Association of State Dam Safety Officials >The Unpermitted Dams Initiative in Washington State
【24h】

The Unpermitted Dams Initiative in Washington State

机译:华盛顿州的不受审计的大坝倡议

获取原文

摘要

This paper discusses an initiative by Washington State's dam safety program to find, inspect and eventually bring into compliance dams that had been constructed without prior approval by the state. The Dam Safety Office of the Washington State Department of Ecology has jurisdiction over any dam that can impound 10 or more acre-feet of water at the dam crest. In March 2008, the Dam Safety Office (DSO) started the effort to find dams that meet this threshold that were not permitted by the state. Over the next 4 months, this search uncovered some 600 water bodies that appeared to be impounded behind unpermitted dams. The DSO then performed inspections of the high hazard projects to verify that they were actually dams, and if so, assessed the condition of the dams and the downstream hazard classification. For those dams that turned out to be high hazard, Notice of Correction letters were sent to the owners requiring them to first make any emergency repairs needed, then to hire an engineer to assess the adequacy of their dams and to design any modifications needed to bring the dams up to current standards. The owners were then given a set amount of time to complete the repairs. Once the repairs were completed, the dams would be considered to be in compliance with state law.
机译:本文讨论了华盛顿州大坝安全方案的倡议,以查找,检查并最终携带尚未经国家批准的拟建规定的合规水坝。华盛顿州生态部的大坝安全办公室对任何可以在大坝嵴扣留10英亩的水的大坝上有管辖权。 2008年3月,大坝安全办公室(DSO)开始努力寻找符合该州不允许的该门槛的大坝。在接下来的4个月内,这次搜索揭示了大约600个水体,似乎被扣除后面的大坝。 DSO然后对高危险项目进行检查以验证它们是否实际上是水坝,如果是,则评估水坝的状况和下游危险分类。对于那些令人患有高危险的大坝,将更正字母的通知发送给要求他们需要首先进行任何紧急维修的业主,然后雇用工程师以评估其水坝的充分性并设计所需的任何修改大坝达到当前标准。然后,业主进行了一定的时间来完成维修。修理完成后,大坝将被视为遵守国家法律。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号