首页> 外文会议>WSEAS International Conference on Robotics, Control and Manufacturing Technology >Cost Saving in an Automotive Battery Assembly Line Using Setup Time Reduction
【24h】

Cost Saving in an Automotive Battery Assembly Line Using Setup Time Reduction

机译:使用设置时间减少的汽车电池组装线中的成本节省

获取原文

摘要

Many past researches had found fast setups and a changeover is required to reduce setup time and manufacturing costs. The two main objectives of this study are: first, to identify the root causes of bottlenecks operations and implement possible solutions to the problems; second, to study the cost saving effect after reducing the setup time. Single Minute Exchange of Die (SMED) methods were applied at two major bottlenecks setup operations; cast on strap and heat seal. The result shows significant reduction of cast on strap setup time to 54% and heat seal setup time to 47%. This study has achieved more than the target 35% of setup time reduction. From setup time reduction, a total cost savings of RM168, 000 was achieved in assembly line A. Meanwhile the company level a total saving of RM1.11 million was achieved for all assembly lines in Company X.
机译:许多过去的研究发现了快速设置,需要转换来减少设置时间和制造成本。本研究的两个主要目标是:首先,识别瓶颈运营的根本原因,并对问题实施可能的解决方案;其次,研究减少设置时间后的成本节约效果。在两个主要的瓶颈设置操作中应用单分钟模具(SMED)方法;在带和热封上铸造。结果表明,对带设置时间的显着减少至54%,加热密封设置时间为47%。该研究已经实现了超过35%的设置时间减少的目标。从设置时间减少,在装配线A中实现了RM168,000的总成本节约。同时,公司级别为公司X中的所有装配线实现了每股汇总的总节约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号