Design Considerations for Large Diameter Buried Pipelines at a Water Treatment Facility with Limited Space, Large Differential Settlements and Corrosive Soils

机译:具有有限空间,大型差动沉降和腐蚀性土壤的水处理设施的大直径埋地管道的设计考虑因素

获取原文

摘要

Orange County Water District (OCWD) and Orange County Sanitation District (OCSD) have embarked on a joint Ground Water Replenishment (GWR) System. One of the projects included in the GWR System is the construction of a new Advanced Water Purification Facility (AWPF) at Water Factory 21, adjacent to OCSD's Treatment Plant No. 1. The AWPF is a 70 mgd (upgradeable to 130 mgd) reverse osmosis (RO) facility, with microfiltration (MF) pre-treatment and ultraviolet (UV) disinfection. Due to the large size of the required facilities and limited space available at the existing Water Factory 21 site, special considerations were needed to route the site piping, which included steel pipelines up to 96-inches in diameter. Additional constraints included corrosive RO brine concentrate, highly aggressive RO product water, soft and highly corrosive alluvial soils with pockets of organic peat, high groundwater, highly variable potential settlements due to seismic-induced liquefaction, and the requirement to keep Water Factory 21 and Treatment Plant No. 1 operational during construction of the new AWPF. These challenges required the use of several special analysis, design, and construction methods, including: installation of buried pipe on piles, special coating systems, large diameter stainless steel pipe, soil-cement slurry backfill, a large, buried, multi-layered pipe gallery backfilled with run-able granular material, and detailed, continuous, pipe-as-beam bending analyses to deal with the widely varying potential liquefaction settlements. This paper provides an overview of the project, followed by a review of the demanding site conditions and constraints. Specific analysis techniques and design approaches will be reviewed, along with some unusual techniques employed during construction of the project.
机译:Orange County County County(Ocwd)和橙县卫生区(OCSD)已经开始了一个联合地面水补货(GWR)系统。 GWR系统中包含的项目之一是在水厂21的新型高级水净化设施(AWPF)建造,毗邻OCSD的治疗厂1号。AWPF是70 MGD(升级至130 MGD)反渗透(RO)设施,微滤膜(MF)预处理和紫外线(UV)消毒。由于现有水厂21个现场所需设施的大尺寸和有限的空间,需要特殊考虑距离网站管道,其中包括直径高达96英寸的钢水管。额外的约束包括腐蚀性RO盐水浓缩物,高腐蚀性的RO产物水,软质和高腐蚀性的冲积土壤,带有有机泥炭袋,高地下水,高度可变的液化沉积物,以及保留水厂的要求21和治疗工厂1号在建造新的AWPF期间运作。这些挑战需要使用几种特殊分析,设计和施工方法,包括:安装埋藏管道上的堆积,特殊涂层系统,大直径不锈钢管,土水泥浆料回填,大,埋设,多层管廊道用延期的颗粒材料回填,详细,连续,管道弯曲分析,以处理广泛变化的电位液化沉降。本文概述了该项目,其次是对苛刻的网站条件和约束审查。将审查具体的分析技术和设计方法,以及在项目建设期间采用的一些不寻常的技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号