How can a water utility construct a 30-mile pipeline project through various adverse conditions with limited funding that is spread over ten years? This paper will address the approach chosen by the City of Greeley, Colorado. Challenges such as steel pricing volatility, negotiating fair right of way crossing fees, easement acquisition, pressure testing and disinfecting the various pipe segments and contractor pre-qualification will be addressed.
机译:水实用程序如何通过各种不利条件构建一个30英里的管道项目,其有限的资金超过十年?本文将解决科罗拉多州的格里菲市选择的方法。将解决钢定价波动,谈判公平的交通费,地役权,压力测试和消毒各种管道段和承包商预先资格的挑战。