首页> 外文会议>Pipeline Division Specialty Conference >Update of the Tarrant Regional Water District Eagle Mountain Connection Project
【24h】

Update of the Tarrant Regional Water District Eagle Mountain Connection Project

机译:更新塔塔里塔雷地区水区鹰山联系项目

获取原文

摘要

Tarrant Regional Water District (TRWD) supplies raw water to over thirty wholesale customers (approximately 1.6 million people) in ten Texas counties. TRWD's existing raw water supply system includes two major reservoirs in East Texas, pipelines and pump stations to deliver water from East Texas to Tarrant County, the West Fork reservoirs, two terminal storage lakes in Tarrant County, and the Benbrook Connection, which delivers East Texas water to the southwest side of Fort Worth. The Eagle Mountain Connection Project will allow TRWD to pump water from their East Texas Reservoirs to Eagle Mountain Lake, which is one of the West Fork reservoirs. The $130-million project will allow TRWD to meet increasing demands in their West Fork service area and will result in power cost savings while increasing the available yield of the TRWD water supplies and the reliability of the TRWD system. The project includes 19 miles of 96-inch (244-cm) and 84-inch (213-cm) pipeline to connect TRWD's East Texas System to their West Fork System, two booster pump stations, a 120-million-gallon balancing reservoir, and a number of other required facilities. This paper presents a project update and lessons learned from the System Reliability and Enhancement Study, Pipeline Route Studies, Operational Study, and Preliminary Design Phases of the project. The project is currently in the Final Design Phase. Construction is scheduled to begin in May 2006.
机译:Tarrant地区水区(TRWD)在十次德克萨斯州县的三十多个批发客户(约160万人)提供原水。 TRWD现有的原料供水系统包括东德克萨斯州东德克萨斯州的两个主要水库,将水从东德克萨斯州送水,西叉县,塔塔县的两个终端储存湖泊,以及德克萨斯州以东德克萨斯州水到堡垒价值的西南部。 Eagle Mountain Connection项目将使TRWD从东德克萨斯水库向Eagle Mountain Lake抽水,这是西叉水库之一。 1.3亿美元的项目将允许TRWD满足西叉服务区的需求越来越大,并将节省能力节约,同时增加了TRWD供水的可用产量和TRWD系统的可靠性。该项目包括19英里96英寸(244厘米)和84英寸(213厘米)的管道,可以将Trwd的东德克萨斯系统连接到其西叉系统,两个加强泵站,120万加仑平衡水库,还有一些其他所需设施。本文介绍了从系统可靠性和增强研究,管道路线研究,运营研究和项目的初步设计阶段了解到的项目更新和经验教训。该项目目前处于最终设计阶段。建设计划于2006年5月开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号