A Case Study: Innovative Open Hole Well Completion Provides Superior Results in Tight Gas Formation in Jilin District, China

机译:案例研究:创新的开放孔井完井提供了中国吉林区紧汽层的卓越成果

获取原文

摘要

Drilling of horizontal wells has increased steadily over the last few years in China on land. As technology has developed, operators have seen the economic and production benefits of drilling horizontally. In the Changling gas field, the Deng Louku formations are primarily low porosity (average 5.2%) and low permeability (average 0.17md) tight sand. Typically, wells in this area are drilled vertically and completed with cemented casing. Proppant fracturing was necessary to produce the well economically due to the low permeability nature of the formation. However the production results from the conventional vertical fracturing completions were not very promising and most of the wells experienced rapid production decline once they were put on production. Thus it became crucial to find an engineering solution to effectively unlock the reserves and obtain sustained long term productivity. Multistage fracturing of the DP2 horionatal well is a milestone for the operator due to: 1) the deepest, and most stages in a single horizontal well in a tight sand formation in China was completed and fractured; 2) the biggest fracturing job for a single well in terms of proppant and fracture fluid volume was successfully pumped continuously by first time application of the precise continuous mixer (PCM) in China; 3) an innovative multistage fracturing design workflow was developed to optimize the horizontal well completion design including several disciplines: geology, reservoir modeling and fracturing. This workflow was set as the standard design process for multistage fracturing design in the field. The DP2 horizontal well was completed in ten stages in the 837 m openhole section and the ten fracturing stages were pumped continuously in 3 days. The PCM was used to improve the fracturing operation efficiency. A total of 1425 tons of 30/50 proppant was successfully placed into the formation using 4870 m~3 fracturing fluid. The well produced 320,000 m~3/day initially and was stabilized at 180,000 m~3/day with 20 MPa wellhead pressure, which is 5 times higher than the average offset well. The application of real time hydraulic fracturing monitor technology helpped to verify that the optimized fracture half-length was achieved, and to adjust the fracturing schedule in real time for the second stage.
机译:在陆地上过去几年,水平井的钻井稳步增加。随着技术开发的,运营商已经看到水平钻井的经济和生产效益。在长岭气田中,邓树布形成主要是低孔隙率(平均5.2%)和低渗透率(平均0.17MD)紧密砂。通常,该区域中的孔垂直钻孔并用粘合的壳体完成。由于地层的低渗透性质,支撑剂压裂是必要的,以经济地生产良好。然而,常规垂直压裂完井的生产结果并不是很有前途,并且一旦经过生产,大部分井都经历了快速的产量下降。因此,寻找工程解决方案,以有效解锁储备并获得持续长期生产力的重要性。 DP2 Horionatal井的多级压裂是操作员的里程碑,因为:1)在中国紧密砂层中的最深,最深层井中的最深层,大多数阶段完成并破裂; 2)通过首次在中国施加精确的连续混合器(PCM),成功地泵送了支撑剂和骨折流体体积的最大压裂工作。 3)开发了一种创新的多级压裂设计工作流,以优化水平井完成设计,包括几个学科:地质,储层建模和压裂。该工作流程被设置为现场多级压裂设计的标准设计过程。 DP2水平孔在837M孔孔部分的十个阶段完成,并且在3天内连续泵送十个压裂阶段。 PCM用于提高压裂操作效率。总共1425吨30/50支撑剂使用4870 m〜3裂缝液成功地置于地层中。最初生产320,000m〜3 /天,并以20MPa井口压力稳定在180,000m〜3 /天中,比平均偏移量高5倍。实时水力压裂监测技术的应用有助于验证是否达到了优化的骨折半长,并实时调整压裂时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号