Founded in 1889, the Hongkong Electric Co., Ltd. (HEC) is responsible for the generation, transmission and distribution of electricity to Hong Kong Island and Lamma Island of Hong Kong SAR. Today, HEC's power station on Lamma Island has a total installed capacity of 3,420MW, serving more than 550,000 customers with a supply reliability rating of 99.999% since 1997. Electricity supply is mainly produced from eight coal coalfired generating units which were developed in fired three stages since 1978 with the last 350MW coal coalfired -fired unit commissioned in 1997. As a result of keeping abreast with the coal coalfired power generation technology advancement and adopting state fired stateof of the theart combustion and steam turbine technology available in market during design stage, generation -art efficienc efficiency y of the units ha has s been improved progressively progressively. . The last coalfired unit equipped with flue gas desulphurisation and low Nox burner systems has achieved a unit efficiency of 42.5%. HEC started exploring the installation of higher higherefficiency combined cycle plants in the late 1990s. Efficiency In meeting the electricity demand in the 21 st century, two of the in inservice -service 125MW gas turbines were converted in 2002 to a combined cycle unit adding an extra output of 115MW without burning additional fuel, resulting in a unit efficienc efficiency improvement fr y from 30% to 45.7%. This was followed by om the development of 1,800MW CCGT plant at Lamma Power Station Extension with first 335MW unit scheduled for commissioning in 4 th quarter of 2006. With the adoption of “F” class gas turbine technology and steam cycle of triple pressure with reheat design, the first gasfired unit will achieve a unit efficiency of 56.5%. This paper presents various technologies adopted by HEC in power generation efficiency enhancement during plant design and equipment selection stage stages, thereby reducing both fuel consumption and s, environmental impact. T This is in partial his fulfilment of HEC’s missions to providing a clean, reliable, highhighefficiency efficiency and affordable electricity supply to customers.
机译:香港电气有限公司(HEC)成立于1889年,负责发电,传播和分配香港岛屿和香港南丫岛SAR。今天,HEC在南丫岛的电力站总装机容量为3,420MW,为550,000多名客户服务于1997年以来的供应可靠等级为99.999%。电力供应主要由八个煤炭煤炭发电机组生产,该煤炭煤炭发电机组成自1978年以来的阶段与1997年委托的最后350MW煤炭煤炭煤炭煤炭。由于在设计阶段,随着煤炭煤炭发电技术进步和采用汽轮机技术的燃煤和蒸汽涡轮机技术的燃煤和蒸汽涡轮机技术的燃烧状态。 Sentce -Art Efficienc效率Y的逐步逐步改善。 。装有烟气脱硫和低NOx燃烧器系统的最后一个煤用装置已经实现了42.5%的单位效率。 HEC开始探索20世纪90年代后期更高版本的联合循环厂的安装。效率在21世纪达到电力需求的效率,其中两种InService -Service 125MW燃气轮机在2002年转换为一个组合的循环单元,在不燃烧额外的燃料的情况下增加115mW的额外输出,导致单元效率提高FR y从30%到45.7%。随后是在2006年4季度调试的第一个335MW单位的Lamma Power Station延伸的OM开发1,800MW CCGT工厂。随着“F”汽轮机技术及重新加热的三重压力蒸汽循环,采用“F”汽轮机技术及三重压力蒸汽循环设计,第一个燃气装置将达到56.5%的单位效率。本文介绍了HEC在工厂设计和设备选择阶段阶段发电效率增强中采用的各种技术,从而降低了燃料消耗和环境影响。这是为了使HEC的任务达成符合HEC任务,为客户提供干净,可靠,高度效率,价格实惠的电力供应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号