首页> 外文会议>Corrosion Conference >EPOXY-COATED REBAR PERFORMANCE IN THE DECK OF THE PERLEY BRIDGE
【24h】

EPOXY-COATED REBAR PERFORMANCE IN THE DECK OF THE PERLEY BRIDGE

机译:佩里大桥甲板上的环氧涂层钢筋性能

获取原文

摘要

The Perley Bridge spans the Ottawa River between the Canadian provinces of Ontario and Quebec. During a 1979 rehabilitation project, epoxy-coated rebar (ECR) was installed in an effort to extend the service life of span 17. External signs of corrosion were observed in the west lane of span 17 as early as 1985, but none were observed in the east lane. The cover concrete on the east lane was almost twice that of the west lane. A wide variety of techniques were used to evaluate the difference between slabs cut from the east and west lanes. The most useful techniques were potential mapping, chloride profiling, petrographic analyses, adhesion testing, epoxy damage, analyses of reinforcing bar-concrete cross- sections, and electrochemical impedance spectroscopy measurements of epoxy properties. Cover depth and chloride contamination were the most significant factors affecting damage to the rebar. Based on these techniques, results showed that the epoxy coating used on the west lane of the Perley Bridge deck in span 17 provided only 1 to 4 years of additional corrosion protection over bare rebar.
机译:PERELY BRIDION跨越了安大略省加拿大省的渥太华河和魁北克。期间1979康复工程,环氧树脂涂覆钢筋(ECR)被安装,以努力延伸跨度在跨度17的西车道早在1985年,观察到腐蚀17.外部体征的使用寿命,但在观察到无东路。东路上的盖子混凝土几乎是西路的两倍。使用各种技术来评估从东西车道切割的板坯之间的差异。最有用的技术是潜在的映射,氯化物分析,岩化分析,粘附试验,环氧损伤,加强棒状横截面的分析,以及环氧性能的电化学阻抗光谱测量。覆盖深度和氯化物污染是影响钢筋损坏的最重要因素。基于这些技术,结果表明,在跨度17跨度17中佩里桥甲板的西部车道中使用的环氧涂层仅提供1至4年的额外腐蚀保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号