首页> 外文会议>ASME Pressure Vessels and Piping Conference >FAILURE ASSESSMENT OF SPRING-OPERATED PRESSURE RELIEF VALVE PROOF TEST DATA FOR EXTENDING TIME-IN-SERVICE
【24h】

FAILURE ASSESSMENT OF SPRING-OPERATED PRESSURE RELIEF VALVE PROOF TEST DATA FOR EXTENDING TIME-IN-SERVICE

机译:弹簧式减压阀防阀防止阀的故障评估,用于扩展役时间

获取原文

摘要

The proof test results of 1669 Spring-Operated Pressure Relief Valves (SOPRV), which were previously installed in active processes, were analyzed with respect to proof test ratio (R), time-in-service (TIS), set pressure (SP), working fluid (WF), material composition of the SOPRV and, if an SOPRV failed-to-open (FTO), the root cause of failure in the FTO failure mode if available. Many of these SOPRV had accumulated TIS in excess of the normal maximum of five years yet proof testing indicated that most would have functioned properly. This paper examines the results of the analysis and provides guidelines under which it is appropriate to consider extending TIS for individual SOPRV.
机译:以先前安装在活性过程中的1669个弹簧操作压力阀(SOPRV)的证据测试结果被相对于证明测试比(R),局部时间(TIS),设定压力(SP)分析,工作流体(WF),SOPLVV的材料组成,如果SOPHV失败开启(FTO),则在FTO失效模式下的故障原因是可用的。其中许多SOPRV累计了TIS超过最多五年的正常最大,但证明测试表明大多数都可以正常运行。本文介绍了分析结果,并提供了适当考虑为单个SOPRD的延伸TIS适当的指导方针。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号