A Study on the Mooring System for the Sinking Installation of the Preassembling Offshore Wind Turbine

机译:沉没的近海风力涡轮机沉没安装的系泊系统研究

获取原文

摘要

This paper describes a solution for the catenary mooring system applied on sinking installation of the pre-assembling offshore wind turbines (POWT) with gravity base foundations. The offshore wind turbines, which pre-assemble concrete caisson gravity foundations with towers and turbines onshore, are adopted float towing for transportation and sinking installation. In sinking installation, the center of buoyancy and gravity meeting will lead the righting moment losing and the POWT capsizing in slight environmental loading such as wind, current and waves. To avoid and control this risk, a temporal mooring system is needed. A simplified and feasible mooring solution is suggested. A demonstrated case study at Taiwan West Coast illustrates that the proposed the multi-leg mooring system with appropriated parameters, such as the total chain length, the maximum tension of the chain, the fixed position and the tension of the mooring point during the sinking installation and verified by the catenary mooring theory.
机译:本文介绍了在沉入预装配海上风力涡轮机(POWT)安装上的屏住停泊系统的解决方案,具有重力基础。近海风力涡轮机,预先装配混凝土沉重基础,采用坐在塔和汽轮机,采用浮动牵引运输和沉降装置。在沉没的安装中,浮力和重力会议的中心将导致右侧的损失和粉末化在轻微的环境载荷,如风,电流和波浪。为避免和控制这种风险,需要一个时间系泊系统。建议简化和可行的系泊解决方案。台湾西海岸的一个案例研究说明了提出的多腿系泊系统具有适当的参数,例如总链长度,链条的最大张力,固定位置和停泊点的张力在下沉安装期间并通过追逐的系泊理论验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号