A LARGE-SCALE PRESSURE SEWER SYSTEM SOLVES WASTEWATER PROBLEMS ON THE NORTH SHORE OF LAKE SUPERIOR

机译:大规模的压力下水道系统解决了苏必利湖北岸的废水问题

获取原文

摘要

The Duluth/North Shore Pressure Sewer Collection System (D/NSPSCS) is located on Lake Superior’s north shore and extends approximately 14 miles from the City of Duluth to the City of Knife River. The $14.6 million system contains 180,000 feet of piping, 375 grinder pump stations and 2 main pump stations. The project exists to correct the problem of failing individual sewage treatment systems in the project area. The D/NSPSCS serves approximately 405 residential, 18 small commercial, and 2 large commercial connections. The project has been under construction since June 2002 with an anticipated completion date of August 2005. The design phase of this project started in 1999 concurrent with an environmental review process that was completed January 2002. The environmental review detailed the many challenges the project faced with regard to protection of the area’s scenic and environmental aspects. The review also contained a unique land use planning process that dealt with the concern for development and growth pressures that could result from the project. The large scale, linear nature of the pressure pipeline network and the terrain along the Lake Superior shoreline created numerous design challenges. These challenges included extensive hydraulic modeling, strategic main pump station placement to avoid empty pipe segments and to limit costs, looped mainline segments, gravity sewer components, odor control for septic conditions, pipeline pigging facilities, trout stream crossings, rock blasting and removal, and unique safeguards to maintain operability during line interruptions. The design also includes a 300,000 gallon detention storage facility to detain wastewater flow from contributing to the sewer overflows during infiltration/inflow related conditions in the receiving sewers. The conclusion and end result of this project is a long-term wastewater solution for the affected north shore of Lake Superior. The use of pressure sewer technology combined with the availability of public funding allowed this much needed project to take place.
机译:Duluth /北岸压力下水道收集系统(D / NSPSC)位于高级北岸,距离德卢斯市约14英里至刀河之城。 1460万美元的系统含有180,000英尺的管道,375辆研磨机泵站和2个主泵站。该项目存在纠正项目区内未能失败的问题。 D / NSPSCS提供大约405个住宅,18个小型商业和2个大型商业连接。自2002年6月以来,该项目已在建设中,预计2005年8月的完工日期。该项目的设计阶段于1999年开始,并于2002年1月完成的环境审查进程。环境审查详细说明了该项目面临的许多挑战所面临的许多挑战关于保护该地区的景区和环境方面的保护。审查还载有一个独特的土地利用规划过程,涉及该项目可能导致的开发和增长压力的关注。压力管道网络的大规模,线性性质和沿湖湖的地形创造了众多的设计挑战。这些挑战包括广泛的液压建模,战略主泵站放置,以避免空管段,并限制成本,环形主线段,重力下水道部件,腐败条件的气味控制,流水线流线,鳟鱼溪流交叉,凿岩爆破和移除,以及独特的保障措施,可在线中断期间保持可操作性。该设计还包括300,000加仑拘留储存设施,以拘留在接收下水道中的渗透/流入相关条件期间从有助于下水道的废水流动。该项目的结论和最终结果是一个长期的废水解决方案,适用于受影响的北湖泊湖泊。压力下水道技术的使用结合公共资金的可用性使得这一急需项目允许进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号