首页> 外文会议>Water Environment Federation annual technical exhibition and conference >THE ASSET MANAGEMENT PROMISE:SEVEN STEPS TO REDUCE OM COSTS THROUGH CAPITAL INVESTMENT
【24h】

THE ASSET MANAGEMENT PROMISE:SEVEN STEPS TO REDUCE OM COSTS THROUGH CAPITAL INVESTMENT

机译:资产管理承诺:通过资本投资降低O&M成本的七个步骤

获取原文

摘要

The City and County of Honolulu Department of Environmental Services (Department) owns and operates seven of the eight wastewater treatment plants on the island of Oahu, Hawaii: Honouliuli Wastewater Treatment Plant (WWTP), Waianae WWTP, Wahiawa WWTP, Sand Island WWTP, Kailua WWTP, Kahuku WWTP, and Pa’alaa Kai WWTP. The Department seeks to improve the cost-effectiveness of the Capital Improvement Plan (CIP) and operations and maintenance of the wastewater facilities that they own and manage. In order to accomplish this, the Department is implementing an Asset Management Program that integrates CIP decisions regarding project need and timing with decisions regarding on-going maintenance repair and replacement. The Program will comply with the new Government Accounting Standards Board Directive No. 34 (GASB 34), and the associated need for an accounting of the condition of existing wastewater assets and value of existing facilities. The Program will also establish a sound basis for budgeting on-going maintenance to achieve the targeted level of service (LOS) and operating performance.
机译:檀香山市和县郡环保服务部拥有,并拥有澳大利亚岛岛岛岛八污水处理厂中的七个,夏威夷:惠洛瑞斯污水处理厂(WWTP),WWIANAE WWTP,Wahiawa WWTP,沙岛WWTP,Kailua WWTP,Kahuku WWTP和Pa'Alaa Kai WWTP。该部门旨在提高资本改善计划(CIP)和运营和维护它们拥有和管理的运营和维护的成本效益。为了实现这一目标,该部门正在实施资产管理计划,该计划将关于项目需求和举办关于持续维护维修和更换的决定的时序整合CIP决定。该计划将遵守新的政府会计准则董事会指令第34号(GASB 34),以及对现有设施的现有废水资产和价值的条件的相关需求。该计划还将为预算持续维护建立合理的基础,以实现目标服务水平(LOS)和经营业绩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号