首页> 外文会议>Annual conference of the Canadian Nuclear Society >LIMERICK BWR TURBINE CONTROL AND PROTECTION SYSTEM UPGRADE SUCCESS
【24h】

LIMERICK BWR TURBINE CONTROL AND PROTECTION SYSTEM UPGRADE SUCCESS

机译:Limerick BWR涡轮机控制和保护系统升级成功

获取原文

摘要

Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented.
机译:Westinghouse和Exelon在Limerick BWR单元1站成功实现了数字电液控制(DEHC),以执行涡轮机控制,保护和电抗器压力功能。 DEHC替换模拟控制和解决的系统性能,过时和可靠性。这是对所使用的分布式控制系统的主涡轮机和BWR压力控制的控制和保护的首先应用。在正常的2014中断期间,在计划中拆除了模拟设备,主控室和前部标准修改以及验收测试。将讨论和提出促进这一成功的项目的关键方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号