Inspection of Link 2 of a Mooring Chain

机译:检查系泊链的链接2

获取原文

摘要

BP wished to confirm the integrity of a mooring chain in the chain stopper location which had been in service a number of years, and required an inspection technique that would give quantitative information. It was agreed that in order to be conservative the detectable flaw size with 90% probability of detection should be 20mm through wall and 100mm long. The restrictions for the inspection were that it had to be carried out in 15m depth of water inside the turret structure, with no demanding tasks on the diver such as probe scanning because of the difficult water conditions. The total distance from the inspection site to the location of the NDE equipment and inspector was around 100 metres. The cables pass through a hazardous area so all inspection cabling and equipment needed to be doubly insulated and protected against sparking of any type.
机译:BP希望确认在连锁塞子位置的系泊链中的完整性,这些链条在不多年年中一直在使用,所以需要提供定量信息的检查技术。据一致认为,为了保守,可检测到90%的检测概率的可检测缺陷尺寸应为20mm,长度为100mm。检查的限制是它必须在炮塔结构内部的15米深度进行,潜水员在潜水员上没有要求探测扫描,因为水条件困难。从检验站点到NDE设备和检查员的位置的总距离约为100米。电缆通过危险区域,因此所有检查布线和设备所需的所有检查布线和设备都需要双重绝缘并防止任何类型的火花。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号