Design Build Operate Maintain (DBOM) Contracts are especially cumbersome for major contractors that are primarily concerned with the fixed facilities (brick and mortar) aspects of the project and tend to not look deeply enough into the systems integration requirements, let alone the safety in design aspects. The MIA Mover APM project is a fast track DBOM project with a very stringent delivery schedule. The Joint Venture responsible for this work assembled a team to meet this time constrained schedule, concentrating on the Fixed Facilities aspects of the contract while relying on a sub contractor to provide the requirements of the Operating Systems. Safety of Design requirements for the Fixed Facilities and the Operating Systems follow a distinctly different path before merging at the end of the project to meet the required Safety Certification requirements. Fixed Facilities requirements for safety certification are generally covered and accepted through local building codes and Authorities Having Jurisdiction (AHJ) through the permitting process for the completed project, while Operating Systems undergo a strict regimen of design reviews that include System, Sub-system, and Operations Support Hazard Analyses by following Military Standards or the ASCE APM Standards as well as state and local requirements. This creates two distinctly different paths of approach that lead to the ultimate goal of Safety Certification and that creates confusion, most notably where interfaces between the fixed facilities and operating systems arise. For the MIA Mover project, recognizing that a more concerted effort was required to demonstrate and meet compliance with the Safety Certification requirements, the Joint Venture developed and implemented an Integrated Safety Management Action Plan that identified responsibilities for design safety through an organizational structure that provided autonomy from the project while including the fixed facilities and operating systems design and the systems integration team. Working closely together, these teams have remarkably accomplished Owner acceptance of all Systems Safety Hazard Analyses within an eight month period; achieved a closure of design hazard analyses of 90%; and identified all Inspection/Test and Manuals and Training mitigations required to achieve full safety Certification.
机译:设计构建运营维持(DBOM)合同对于主要涉及项目的固定设施(砖和砂浆)方面的主要承包商特别麻烦,并且倾向于对系统集成要求的倾向于深入看,更不用说设计安全方面。 MIA MOVER APM项目是一个快速跟踪DBOM项目,具有非常严格的交付计划。负责这项工作的合资企业组建了一支团队,以满足此时间约束的时间表,专注于合同的固定设施方面,同时依靠分包商提供了操作系统的要求。固定设施和操作系统的设计要求的安全性遵循项目结束前的明显不同的路径,以满足所需的安全认证要求。固定设施的安全认证要求通过当地建筑规范和当局通过司法管辖区(AHJ)通过完成项目的允许流程而接受,而操作系统经过严格的设计评论方案,包括系统,子系统和通过以下军事标准或ASCE APM标准以及国家和当地要求,运营支持危险分析。这产生了两个明显不同的方法,导致安全认证的最终目标,并产生混淆,最值得注意的是,在固定设施和操作系统之间的界面出现的情况下。对于MIA MIA MOVER项目,认识到需要更协调一致的努力来证明和满足遵守安全认证要求,该合资企业制定和实施了一项综合的安全管理行动计划,通过提供自主的组织结构确定了设计安全的责任来自项目,同时包括固定设施和操作系统设计和系统集成团队。与八个月内的所有系统安全危险分析相要紧密地工作,这些团队在八个月内的所有系统安全危险分析中取得了显着的成就;达到了90%的设计危险分析;并确定了实现全面安全认证所需的所有检查/测试和手册和培训减压。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号