首页> 外文会议>International conference on sustainable construction & risk management >The risk assessment model of TOT concession period based on Time Fuzzy Petri Net
【24h】

The risk assessment model of TOT concession period based on Time Fuzzy Petri Net

机译:基于时间模糊Petri网的Tot租后时期风险评估模型

获取原文

摘要

TOT concession period is the core issue of project financing, but also the focal focus of contract negotiations. This paper analysis risks of decision-making of TOT concession period, according to Dynamic NPV of Recipient, builds and resolve a Fuzzy Stochastic Petri net model for assessing the RBS, provides a new solution ideas and methods for TOT concession period risk assessment.
机译:特许特许期间是项目融资的核心问题,也是合同谈判的焦点。本文分析了TOT租后期决策的风险,根据收件人的动态NPV,建立和解决一个用于评估RBS的模糊随机培养净模型,为TOT租后期风险评估提供了新的解决方案思路和方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号