China Steel Corporation (CSC) has four blast furnaces in operation with an average PC rate of 136-143 kg/thm with the dilute phase injection system in 2006-2007. No.4 blast furnace reached a PC rate of 151 kg/thm in February 2004, approximately 117 percent of the designed injection capacity of 45t/hr. Due to the limitation of the injection capacity of the existing system; CSC carried out a project to upgrade the injection system in 2006. The injection system of CSC No.4 blast furnace was modified to dense phase system according to the technology of KUETTNER Company in one scheduled shutdown in May 2007. Through the proper burden distribution and operational parameter adjustment, the PC rate was increased to 178 kg/thm in November 2007, corresponding to a 65t/hr injecting rate with a productivity of 2.58 t/m3/d. This paper describes the modifications of the injection system, the problems encountered after commissioning and the strategies of process control.
机译:中国钢铁公司(CSC)有四个高炉运行,平均PC速率为136-143千克/ THM,2006 - 2007年稀液期注射系统。 2004年2月4日高炉254年2月的PC率达到了151公斤/吨,约117%的45t / hr。由于现有系统的注射能力的限制; CSC在2006年进行了一个升级注射系统的项目。根据Kuettner公司的技术在2007年5月,根据Kuettner公司的技术进行了修改为密集相系统的注射系统。通过适当的负担分布和操作参数调整,2007年11月的PC速率增加到178公斤/吨,对应于65T / HR注入率,其生产率为2.58 T / M3 / d。本文介绍了注射系统的修改,调试后遇到的问题及过程控制策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号