摘要

A current carryover storage project in San Diego County, California is used to illustrate the concept that structured engineering-environmental interaction adds significant value to the successful implementation of the planning, design, and construction phases of virtually any large project. This concept, which was first presented to USSD in 2005, has evolved through years of experience on projects of all types throughout the U.S., but it has matured over the past 15 years through cooperative efforts on several water resource projects undertaken by the San Diego County Water Authority (Water Authority). The Engineering-Environmental Interaction concept is founded on the premise that naturally and mutually beneficial points of coordination exist between engineering designers/constructors and environmental planners/monitors on any project. If properly recognized and utilized, these points of coordination can add great benefit to the project, from start to finish. Perhaps the item of greatest interest to USSD members is the fact that this concept can be implemented through the use of simple tools, mainly schedules, project plans, and well-coordinated communications designed to clearly identify points of interaction and the benefits of a coordinated effort. The purpose of this paper is to demonstrate the application of this concept, and to show how implementation of a structured engineering-environmental interaction program has added value to the carryover storage project currently being undertaken by the Water Authority. This paper discusses how the interaction process was formulated for this project, how it has been implemented throughout the planning phase (preliminary design, environmental documentation, and permitting), and how it will be employed during the final design and construction phases.
机译:在圣迭戈县,加州的电流结转存储项目是用来说明概念,结构工程,环境的相互作用增加了显著的价值成功实施的规划,设计,施工几乎任何大型项目的阶段。这个概念,这是第一次呈现给USSD于2005年,经历了多年的所有类型,在美国的项目的经验发展而来的,但它已通过由圣迭戈县开展的几个水资源项目合作努力成熟,在过去的15年水务局(水务局)。该工程环境互动的概念是建立的前提下,工程设计师/建设者和规划者环境/监测器上的所有项目之间的协调存在的自然和互利点。如果正确识别和使用的,协调的,这些点可以添加到项目大有裨益,从开始到结束。也许最感兴趣的USSD成员的项目是,这个概念可以通过使用简单的工具,主要日程安排,项目计划,并协调良好的通讯设计清楚地识别交互点和协调努力的利益来实现。本文的目的是证明这个概念的应用,并显示出实施结构工程环境互动节目是如何增值到目前正由水务局开展的结转储存项目。本文讨论的相互作用过程是如何制定这个项目,它是如何目前已在规划阶段(初步设计,环境的文件,并允许)实施,以及它将如何在最后的设计和施工阶段使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号