The Challenges of Offshore Power System Construction - Bringing Power Successfully to Troll A, One of the Worlds Largest Oil and Gas Platform

机译:海上电力系统建设的挑战 - 成功地将力量成功地实现巨魔A,世界上最大的石油和天然气平台之一

获取原文

摘要

In February 2005 the world's first offshore HVDC transmission was successfully commissioned. It consists of two parallel 40 MW transmissions connecting the Troll A gas platform in the North Sea, with the mainland 132 kV grid via compact polymeric DC cables. A compact and lightweight offshore module was designed by ABB in collaboration with the client Statoil. The project has given ABB, valuable experience in the design and construction of high voltage plant in a salt laden, hostile environment. With safety as a primary consideration ABB has gained considerable experience in offshore construction techniques. The success of the ABB Troll project has been one of the key components for British Petroleum, who in June 2005 placed a second offshore HVDC Light order with ABB for their 78 MW transmission to the Valhall field. The engineering design and construction challenges overcome by ABB in these pioneering offshore projects is directly transferable to the new high power, high voltage, offshore substations required to enable, safe, reliable operation of the future very large offshore wind farms.
机译:2005年2月,世界上第一个近海HVDC传输成功委托。它由两个平行的40 MW传输,将虹杆在北海中的气体平台连接到北海,内地132 kV电网通过紧凑的聚合物DC电缆。通过ABB与客户端Statoil合作,设计了一个紧凑而轻巧的海上模块。该项目已在盐水包装,敌对环境中的高压厂设计和施工方面提供了ABB,有价值的经验。由于初级考虑,ABB在海上施工技术中获得了相当大的经验。 ABB Troll项目的成功是英国石油的关键组件之一,于2005年6月,第二次海上HVDC轻型命令与ABB为78 MW传播到Valhall领域。 ABB在这些开创性的离岸项目中克服了工程设计和施工挑战,直接转移到新的高功率,高压,近海变电站所需,使未来非常大的海上风电场的运行能力,安全,可靠运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号