首页> 外文会议>Society of Petroleum Engineers international conference on health, safety environment in oil and gas exploration and production >Environmental and Social Management of Seismic Operations in Sensitive Tropical Rainforest
【24h】

Environmental and Social Management of Seismic Operations in Sensitive Tropical Rainforest

机译:敏感热带雨林中地震作业的环境与社会管理

获取原文

摘要

The remaining on-shore petroleum reserves in Ecuador are located within culturally and environmentally sensitive areas of the lowland tropical rainforest at the headwaters of the Amazon Basin, including protected nature reserves and indigenous communities. Regulatory obligations and stakeholder concerns require an extensive formal and informal consultation process prior to petroleum activities in these areas. EnCana and Walsh Environmental Scientists and Engineers (WALSH) have used the first phase of petroleum development in Yasuni National Park (YNP), seismic exploration, to gain the trust and confidence of a diverse group of stakeholders, by adopting an innovative set of new best practices, transparent dialogue and direct participation of the stakeholders. The result of this consultation process was a modified project design and the EMP (Environmental Management Plan) that restricted heliports to previously intervened areas; restricted flight paths of helicopters away from scientific research stations, restricted use of rivers; and created offsets from sensitive micro-habitats like clay/salt licks, animal bathing areas, and tree-cutter ant farms. The execution of the project was closely monitored and audited by EnCana, WALSH, the affected Communities, an independent Environmental and Social Scientific Advisory Committee (ESSAC), an independent auditing consultant associated with the most respected environmental Non-Governmental Organization (NGO) in Ecuador, the Ministries of Environment, Energy and Mines and the National Heritage Institute of the Ecuadorian government. This participatory approach during seismic exploration has facilitated acceptance for the current exploratory drilling activities in this highly sensitive area.
机译:在厄瓜多尔其余陆上石油储量位于内的低地热带雨林的文化和环境敏感区,在亚马逊河流域的源头,包括受保护的自然保护区和土著社区。监管义务和利益相关方的关切之前需要在这些地区石油活动的广泛的正式和非正式的协商进程。 EnCana公司和沃尔什环境科学家和工程师(WALSH)已经用在亚苏尼国家公园(YNP)石油开发,地震勘探的第一阶段,从而获得不同群体的利益相关者的信任和信心,通过采用创新的一套新的最佳做法,透明的对话和利益相关者的直接参与。这一磋商进程的结果是一个修改的项目设计和直升机场受限于先前干预地区EMP(环境管理计划);直升机从科研站,限制使用的河流走的限制飞行的路径;和创建与敏感的微栖息地等粘土/盐舔,动物洗浴区,和树刀片蚂蚁农场偏移。该项目的执行,密切监测和审计,EnCana公司,WALSH,受影响的社区,一个独立的环境和社会科学咨询委员会(ESSAC),最推崇的环保非政府组织(NGO)在厄瓜多尔的一个独立的审计顾问,环境,能源和矿业和厄瓜多尔政府的国家遗产研究所的部委。地震勘探在这种参与的方式促进了接受当前勘探钻井活动,在这个高度敏感的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号