首页> 外文会议>International Conference on Fluvial Hydraulics >Soil/water interaction during the breaching process of overtopped embankments
【24h】

Soil/water interaction during the breaching process of overtopped embankments

机译:突破堤坝突破过程中的土壤/水相互作用

获取原文

摘要

When a flood exceeds the design level of an embankment dam, the dam will be overtopped and breaching can occur. Consequences are major flooding of the area beyond the dam, which can at least cause high economical damage. Residents, local governmental administrations and environmental agencies are highly interested in knowing the precise description of possible breach development and outflow hydrograph Q(t). Many publications and models are available on this topic and model outputs can vary up to ± 50% from the original data. This is due to a limited understanding of the processes involved in the breaching of embankments and the lack of fundamental experimental data. The research presented in this paper has the following aims: First, to generate a reliable data base by carrying out physical experiments (scaled 1:10) and measuring the outflow hydrograph and the erosion of the embankment material per time (erosion curve). Second, to improve the knowledge of the soil/water interactions in partly saturated soils, represented by the water tension in the breach slopes. And third, to provide a 3D elevation picture of a breaching geometry in homogeneous embankments.
机译:当洪水超过堤防大坝的设计级别时,大坝将被螺纹覆盖,可能发生违规。后果是大坝超出了该地区的主要洪水,这至少可以造成高经济的损害。居民,地方政府主管部门和环境机构非常有兴趣了解可能的违规发展和流出水文Q(T)的精确描述。在本主题上提供许多出版物和模型,型号输出可以从原始数据变化到±50%。这是由于对违反堤防的过程和缺乏基本实验数据所涉及的过程有限。本文提出的研究具有以下目的:首先,通过进行物理实验(缩放1:10)来产生可靠的数据库并测量流量水文每次(侵蚀曲线)的流出材料的侵蚀。其次,为了提高部分饱和的土壤的土壤/水相互作用的知识,由突发倾斜的水张力表示。第三,在均匀堤防中提供突破几何形状的3D升高图像。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号