【24h】

Status Of ECRH Project On EAST Tokamak

机译:ECRH项目的状态在东托卡马克

获取原文

摘要

A 140GHz electron cyclotron resonance heating and current drive (EC H&CD) project for EAST Tokamak is launched in 2011 with a total power of 4MW and pulse length of 100 s. The main objectives of the system are to provide central H&CD, assist start-up and control of MHD activities. The system comprises four gyrotrons each with nominal output power of 1MW at 140GHz. The RF power, transmitted through four evacuated corrugated waveguides will be injected into plasma from the low field side (radial port). The front steering equatorial launcher directs the RF beam over ±250 toroidally and scans over 38o poloidally. At present, the construction of the first 1MW system is undergoing for the expected campaign in the end of 2013. In this paper, the current status of the development and the design of the 140-GHz ECRH system are presented.
机译:2011年,East Tokamak的140GHz电子回火谐振加热和电流驱动器(EC H&CD)项目推出,总功率为4MW,脉冲长度为100秒。 该系统的主要目标是提供H&CD中央,协助启动和控制MHD活动。 该系统包括四个陀螺仪,每个陀螺折叠在140GHz的标称输出功率为1MW。 透过四个抽真空波纹波导的RF功率将从低场侧(径向端口)注入等离子体中。 前转向赤道发射器将RF光束引导超过±250的环形并扫描超过380个编码。 目前,在2013年底,对预期的活动进行了预期的运动进行了建设。本文提出了现有发展和140GHz ECRH系统的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号